Namma Metro ( Kannada: ನಮ್ಮ ಮೆಟ್ರೊ "Our metro") also known as Bangalore Metro (Kannada: ಬೆಂಗಳೂರು ಮೆಟ್ರೊ) is the under-construction mass – transit rail system for the city of Bangalore, India. The agency responsible for its implementation is the Bangalore Metro Rail Corporation Ltd (BMRCL). The first stretch between Baiyyappanahalli to M.G. Road was scheduled to open on April 4, 2011 on the occasion of Ugadi.  However it failed to meet the deadline due to delays in obtaining safety approvals. The metro is expected to reduce the traffic volume in areas like Majestic (Kempegowda Bus station and Bangalore Railway Station), Sampige Road, Hudson Circle and M.G. Road. 


The Route Map

The Bangalore Metro weaves through the bustling commercial and residential areas of the city. The first phase of Bangalore Metro, consisting of two corridors of double line electrified, will cover a total of 42.30 km.

The East-West corridor will be 18.10 km. long, starting from Baiyappanahalli and terminating at Mysore Road terminal, going via Swami Vivekananda Road, Indiranagar, Halasuru, Trinity, Mahatma Gandhi Road, Cricket Stadium, Vidhana Soudha, Central College, Majestic, City Railway Station, Magadi Road, Hosahalli, Vijayanagar and Deepanjali Nagar.

The 24.20 km. North-South corridor will begin at Nagadandra and terminate at Puttenahalli going via Mahalakshmi, Rajajinagar, Kuvempu Road, Malleswaram, Swastik, Majestic, Chikpete, City Market, K.R. Road, Lalbagh, South End Circle,Jayanagar and Puttenahalli.

Out of the 42.30 km., 8.822 km. will be underground near City Railway Station, Vidhana Soudha, Majestic and City Market and most of the rest will be elevated. 

GAUGE :  Standard Gauge
TRACTION:  750V dc Third Rail
SPEED: Max      80Kmph ; Sch. 32Kmph     
NO. OF STATIONS : 41
TRAVEL TIME 33/44 Mins. (end to end)

The Bangalore Metro passes through the busy commercial and residential areas of the city. The first phase of Bangalore Metro, consisting of two corridors of double line electrified, will cover a total of 42.30 ms. The East-West corridor will be 18.10 km. long, starting from Baiyappanahalli and terminating at Mysore Raod terminal, going via, S.V.Road, Indiranagar, C.M.H.Road, Halasuru, Trinity Circle, M.G.Road, Cricket Stadium, Vidhana Soudha, Central College, majestic, City Railway Station, Magadi Road, Hosahalli, Vijaynagar and Deepanjali Nagar.

The 24.20 km. North – South corridor will begin at Nagasandra and terminate at Puttenahalli going via Mahalakshmi, Rajajinagar, Kuvempu Road, Malleswaram, Swastik, Majestic, Chikpete, City Market, K.R.Road, Lalbagh, South End Circle, Jayanagar and Puttenhalli.

Out of the 42.30 km., 8.822 km. will be underground near city Railway Station, Cidhana Soudha, Majestic and City Market and most of the rest will be elevated.

The Bangalore Metro has been designed for a capacity of 40, 000 PHPDT. The number of passengers expected to travel on the metro everyday is estimated at 10.20 lakhs in 2011 and 16.10 lakhs in 2021.

East West Corridor :  Baiyappanahalli Terminal - Mysore Road Terminal  - 17.90 kms,  Stations East West Corridor -16

North South Corridor:   Hesarghatta Cross  -  Puttenhalli Cross  - 23.87 km, Stations North South Corridor -24